A kitchen renovation in the GTA falls into one of two camps. The first is cosmetic — new cabinets, new counters, new flooring, paint. Two to four weeks, no walls moved, no permits. The second involves taking out a wall, relocating plumbing or gas, or extending the room into adjacent space. That’s a structural project: six to ten weeks, permit drawings, an inspector or two. Knowing which one you’re doing changes everything that follows.
What’s actually involved
Most homeowners come to us with a Pinterest board and a number. We work backward from both. The number tells us whether we’re in the cosmetic camp ($35,000–$60,000 for most GTA homes) or the structural one ($80,000–$180,000+). The Pinterest board tells us the design language — modern flat-panel, transitional shaker, English in-frame, contemporary slab. Once those two are pinned, the sequence is straightforward: measured drawings, cabinet layout, appliance schedule, electrical and plumbing rough-ins, demo, install, finish.
The decisions that drive cost most are cabinetry (custom vs. semi-custom vs. stock), counter material (laminate vs. quartz vs. natural stone), and whether you need to relocate gas or water lines. Appliance package matters less than people think — a Wolf range and a GE Café range install for the same labour cost.
How long it takes, realistically
A cosmetic kitchen we can turn around in three to four weeks of on-site work, plus four to six weeks of cabinet lead time. So homeowners are typically without a kitchen for a month, with another month or two of pre-work happening behind the scenes.
Structural projects need permits, which adds two to six weeks before any demo can start. Brampton’s permit office is faster than Toronto’s; Oakville and Burlington are middle-of-the-road. Once permits are in hand, plan on eight to ten weeks of construction for a typical wall-removal-plus-relocation kitchen.
The number-one delay we see is decisions. Counters, hardware, and tile picked late hold up the install. We try to lock those choices before demo starts.
What it costs in 2026
Honest ranges for a 150–200 sq. ft. GTA kitchen, materials and labour combined, before HST:
- Cosmetic refresh — $35,000 to $60,000. Reface or replace cabinets, new quartz, new sink, new lighting, new flooring, paint.
- Mid-range full renovation — $65,000 to $110,000. New custom or high-end semi-custom cabinets, full appliance package, lighting redesign, plumbing relocations, possibly a new island.
- Structural / luxury — $120,000 to $250,000+. Wall removal, structural beams, expanded footprint, premium cabinetry, natural stone, integrated appliances.
The biggest cost movers are cabinets (40–55% of project total) and counters (8–15%). Cutting elsewhere — backsplash, paint, hardware — saves money but doesn’t change the project meaningfully. Cutting cabinets does.
Permits, codes, and GTA specifics
A permit is required any time you’re moving a wall, relocating gas, adding electrical circuits beyond replacing existing ones, or changing the building’s footprint. Cabinet swaps and counter changes don’t need permits.
Ontario Building Code requires GFCI protection on every kitchen counter receptacle, dedicated 20-amp circuits for small appliances, and a hardwired smoke alarm interconnected with the rest of the home if you’re touching electrical. Gas line work has to be done by a TSSA-licensed gas fitter and inspected separately from the building permit.
Each GTA city has quirks. Brampton’s permit reviews focus on structural details. Oakville’s heritage districts (Old Oakville, Bronte) add a heritage permit step on top of the building permit. Niagara Falls has stricter setback rules that can affect knock-out walls on exterior runs. We handle the permit applications and coordinate the inspector visits — it’s part of every structural project we run.
Why homeowners hire us
We’ve been renovating kitchens across the GTA since the company started. Every project gets a single point of contact from quote to handoff — no being passed between sales, design, and trades. Our cabinet supply chain is local (Brampton and Mississauga shops), which means lead times are weeks not months and warranty issues get resolved fast. Every kitchen comes with a written warranty on workmanship, and we don’t ask for final payment until you’ve used the kitchen for two weeks and signed off.
Kitchen renovations in your city
We work across the GTA. Pick your city to see what’s specific about kitchen renovations there — common housing stock, typical layouts, and recent projects we’ve completed nearby.
Frequently asked questions
Can I live in the house during a kitchen renovation?
Most clients do. We set up a temporary cooking station, seal off the kitchen with poly, and run separate dust extraction. The two weeks without a working sink are the hardest part.
Do you supply cabinets, or do I source them?
Either way works. We have preferred suppliers (custom and semi-custom) that we’ve vetted for quality and lead time, and we pass through cost without markup. If you have a designer or want to source from elsewhere, we coordinate.
How much should I budget for unexpected costs?
For a cosmetic project, a 10% contingency covers most surprises. For a structural project, build in 15–20% — old GTA homes often hide knob-and-tube wiring, undersized supply lines, or rotted subfloor under the existing kitchen.
Do you offer financing?
We don’t lend directly, but we work with two GTA contractors-finance partners that handle homeowner financing for projects in the $30,000+ range. Ask for an introduction during your consultation.
What’s your warranty?
Two years on workmanship and installation. Manufacturer warranties on cabinets, counters, and appliances pass through to you and run their own terms — typically 5–25 years on cabinets, lifetime on quartz, 1–10 years on appliances.