A whole-home renovation is the project that gives ARR its name. You’re not picking a kitchen or a bathroom — you’re rebuilding how the house works. Walls move, plumbing and electrical get pulled back to the panels, the layout changes, finishes are unified front-to-back. Done well, the result is a home that lives like new construction without the disruption of moving. Done poorly, it’s a year of mistakes and a budget that ran twice the original quote.
What “whole home renovation” actually means
The phrase covers a wide range. At the lighter end: a flooring replacement throughout, a kitchen redo, both bathrooms refreshed, paint everywhere, new lighting. Three to four months on-site, $150,000 to $250,000 for a typical GTA detached home. No structural changes.
At the heavier end: gut to the studs, new layout, new HVAC, new electrical service, new plumbing, possibly a second-storey addition or a rear-yard extension. Six to twelve months on-site, $400,000 to $1,000,000+. Engineered structural drawings, multiple permits, architect involvement.
Most of our projects are in the middle: $250,000 to $500,000, four to seven months on-site, partial structural work (one or two walls relocated, a kitchen and bathroom layout change), full mechanical and electrical updates, all-new finishes throughout.
The sequence that keeps these projects on track
Whole-home renovations fail when contractors run them like big single-room projects. They aren’t. The sequence is: design phase (4–8 weeks), permit phase (4–8 weeks, parallel with material orders), demo (1–2 weeks), structural and mechanical rough-ins (3–6 weeks), inspections, drywall and primer (2–3 weeks), trim and finishes (4–8 weeks), kitchen and bathroom installs (2–4 weeks), final finishes and snag list (1–2 weeks).
The design phase is where most of the project’s success or failure is decided. Layout decisions, material specifications, appliance choices, and fixture selections all need to be locked before demo. Late changes after rough-ins are 5–10x the cost of the same change made on paper.
We require a 30% deposit to start design, and the design phase produces a fixed-price contract for the construction phase. Change orders happen — they always do — but the baseline is stable.
Living through it
You can’t live in a home that’s being gutted. Most clients move out for the duration. Some stay for the lighter projects (kitchen-and-bath only, no whole-house upheaval), but the dust, noise, and lost utilities of a structural project make staying impractical.
The honest conversation we have on day one: where will you live, and what’s the cost of that? A six-month rental in the GTA runs $20,000–$40,000 depending on the neighbourhood and the size you need. Some clients move in with family. Some have a second property. Some plan the project around a Florida winter. We help homeowners think this through before signing — it’s part of the project’s real cost.
What it costs in 2026
Honest ranges for whole-home renovations of detached GTA homes (1,800–3,500 sq. ft.), before HST:
- Cosmetic refresh + light renovations — $150,000 to $250,000. New flooring, paint, kitchen, bathrooms, lighting. No structural.
- Mid-level renovation — $275,000 to $500,000. Layout changes, full mechanical, all finishes, structural for one or two walls.
- Full gut renovation — $500,000 to $900,000. Studs out, new everything, possibly an addition.
- Whole-home with significant addition — $900,000 to $2M+. Second-storey addition, rear extension, or both.
Cost-per-square-foot of finished space ranges from $80/sqft (cosmetic) to $400+/sqft (gut renovation with high-end finishes). The square-foot number is the comparison metric homeowners ask for, but it’s misleading until the scope is defined.
Permits, codes, and project management
Whole-home renovations almost always need a building permit, often multiple. A typical project pulls a building permit (structural, plumbing, electrical), a separate ESA permit for major electrical work, and possibly a heritage permit (Oakville’s older neighbourhoods, parts of Hamilton). HVAC replacement is permitted separately or rolled in.
Inspection visits during a whole-home renovation typically include: structural framing, rough plumbing, rough electrical (ESA), insulation, vapour barrier, drywall, gas (TSSA, separate visit), and final occupancy. We coordinate every visit and never close walls before the relevant inspection passes.
For projects pushing scope into structural changes — beams replacing load-bearing walls, additions, second storeys — we engage structural engineers and (where required) architects. Their drawings stamp the permit application. Cost varies by project: a single LVL beam analysis runs $1,500–$3,000; full architectural drawings for a second-storey addition are $15,000–$40,000.
Why homeowners hire us for the big projects
A whole-home renovation is too big to run on goodwill and a handshake. We use a written design contract, a fixed-price construction contract, weekly client check-ins, photo documentation of every covered surface (walls before drywall goes up), and a snag list at the end that we don’t consider closed until you sign it. Our project managers carry one project at a time during the build phase — not three, not five — so the homeowner has direct access to a decision-maker every day.
Whole-home renovations in your city
We take whole-home projects across the GTA. Pick your city to see what’s specific to renovations there — typical housing stock, common scope drivers, and recent projects.
Frequently asked questions
How do I know if a whole-home renovation makes sense vs. just selling and moving?
Run the math: what’s the renovated value of your home minus the project cost minus your current value? If that number is positive (you’re “making money on the renovation”), it’s an easy decision. If it’s negative but small, the lifestyle value of the renovated home often justifies it. If it’s deeply negative, moving is usually the right answer. We have honest conversations about this at the consultation — we’d rather not take a project the math doesn’t support.
How do I budget for a project that doesn’t have a fixed scope yet?
Get to fixed scope first. We charge a design fee (typically $5,000–$15,000 depending on project size) that covers measured drawings, layout iterations, and a fixed-price construction quote. The design fee is credited against the construction contract if you proceed.
What’s the ROI on a whole-home renovation?
GTA detached-home data: typical recovery is 65–85% of project cost on resale within five years. Specific neighbourhoods (mature Brampton, Burlington Aldershot, central Oakville) trend higher. The ROI calculation is more compelling when you factor in the years of use you get out of the renovated home before selling.
Can I phase a whole-home project over two or three years?
Sometimes. Kitchen + main floor in year one, bathrooms in year two, basement in year three. The phasing works for cosmetic projects. For structural or mechanical (HVAC, electrical service, plumbing main) the work has to happen in one campaign — splitting it is more expensive and creates code-compliance issues.
What’s the longest project you’ve done?
Eleven months on-site, an Oakville heritage home with a second-storey addition, structural foundation work, and full restoration of original millwork. The eleven months were planned eleven months, not eleven months of overrun. Long projects only work when the timeline is honest from the start.