A whole-home renovation works best as one project with one schedule, one point of contact, and one fixed price — not a string of disconnected trades. In Burlington that means working with the home you have: an older Roseland or Aldershot house with good bones and a dated layout, a Millcroft build that’s tired rather than broken, or an escarpment-edge property in Tyandaga.
What whole-home covers
Most Burlington whole-home projects combine the same moves: opening the main floor, redoing the kitchen and bathrooms, new flooring throughout, a panel and HVAC upgrade to carry the new loads, and often a finished basement or an addition. Doing it as one coordinated project means the framing, wiring, plumbing, and HVAC get sequenced once — you don’t pay to open the same wall twice.
Burlington-specific layers
Niagara Escarpment. North Burlington — parts of Tyandaga and the rural edge — falls within the Niagara Escarpment Plan area, where the Niagara Escarpment Commission has approval authority over development. Additions and exterior changes there carry an extra approval step we plan around.
Conservation Halton. Lots near Grindstone Creek in Aldershot and other regulated watercourses need conservation-authority sign-off for additions or grading near the regulated area before the City issues a building permit.
Clay soil. Burlington’s clay affects foundation design for additions — footings and drainage have to account for it. We design for the soil rather than assuming.
Budget and process
Burlington whole-home budgets range widely — a cosmetic refresh of a 2,000 sq. ft. home might be $75,000–$140,000, while a gut with structural changes and an addition runs $230,000 to $550,000-plus. Square footage, structural scope, and finish level drive the number. We scope it in detail and hand you a fixed-price contract before demolition. The full process is on our home renovation page.
Frequently asked questions
Can we stay in the house during the work?
For a phased renovation, often — we seal off zones and keep a working kitchen or bath as long as we can. For a full gut, no, and we’ll say so up front.
Do you handle drawings and permits?
Yes — design and permit drawings in-house, with a structural engineer for beams and an architect when scope or escarpment review requires it. One team coordinates it.
How long?
A cosmetic refresh is six to ten weeks; a full gut with an addition is four to eight months plus permit and any escarpment-review time at the front.