Kitchen Renovation in Whitby

Whitby covers a lot of ground in one town — the heritage homes of the downtown core, the character houses of historic Brooklin, and the newer family subdivisions in between. The right kitchen renovation depends on which Whitby you’re in: opening up and updating a century home is a different job than lifting a builder kitchen in a 2000s subdivision, and we do both.

Heritage and Brooklin character homes

In the downtown core and old Brooklin, kitchens were built closed off at the back of the house. Opening them up transforms the home — but these older homes need care: the wall is usually load-bearing (an engineered beam, permitted — see framing), and behind the plaster there’s often older wiring and galvanized plumbing worth updating while the wall is open. We modernize the function while keeping the trim, proportions, and character that make these homes worth owning.

Newer subdivision kitchens

In the Williamsburg, Rolling Acres, and Taunton-area subdivisions, the structure is sound and the work is lifting a builder kitchen to custom — better cabinetry, stone counters, a proper island, and storage that works. These projects move efficiently on good bones, though a full panel may still need an electrical upgrade for the appliance load.

Budget and process

A full kitchen renovation in Whitby typically runs $35,000 to $80,000-plus depending on cabinetry grade, whether walls move, and the appliance package — more in a heritage home where wiring and plumbing also need updating. We give a fixed-price contract once the design is locked. The deeper breakdown is on our kitchen renovation page.

Frequently asked questions

Can you open up my downtown Whitby or Brooklin kitchen without losing its character?
Yes — that’s the goal. We open the layout with a proper engineered beam and update the systems behind the walls, while keeping the trim and details that give the home its character.

My subdivision kitchen is sound but dated — worth renovating?
Often yes — upgrading the cabinetry, counters, island, and storage gives you the kitchen you wanted, efficiently, since the bones and services are good.

How long does it take?
A finish update runs three to five weeks; a heritage-home gut with structural and systems work, eight to ten.

Doing more? See home renovations in Whitby or add a bathroom renovation while the trades are on site.

Get a Free Quote

Amar Royal Renovations