A bathroom renovation is a waterproofing job before it’s a design project — behind the tile, the membrane decides whether the room lasts. In Whitby that spans two kinds of work: carefully updating bathrooms in the heritage downtown and Brooklin character homes, and upgrading builder ensuites in the newer subdivisions.
Waterproofing done right
Tile doesn’t keep water out; the membrane behind it does. Every wet area we build gets a proper bonded waterproofing system over cement board — not the green drywall we still pull out of older Whitby bathrooms. Walk-in and curbless showers need the slope, drain, and membrane coordinated before the first tile. Heated floors go in at rough-in, tied into the electrical permit.
Heritage homes and newer ensuites
In downtown and Brooklin character homes, opening a bathroom wall often reveals galvanized supply lines or an aging stack worth replacing while access is easy — our plumbing crew handles it. In the newer subdivisions, the work is usually an ensuite upgrade — replacing the builder corner tub and fibreglass shower with a proper tiled walk-in, a double vanity, and heated floors. Either way, proper ventilation sized and ducted to the exterior keeps humidity from causing trouble.
What it costs in Whitby
- Powder room — $7,500 to $14,000.
- Family bath, full gut — $17,000 to $32,000.
- Primary ensuite — $28,000 to $55,000-plus depending on stone, glass, and layout.
The full breakdown is on our bathroom renovation page.
Frequently asked questions
Can you replace my builder ensuite’s corner tub with a walk-in shower?
Yes — one of the most-requested subdivision projects. We remove the tub, build a proper waterproofed walk-in (curbless if you like), and can add heated floors and a double vanity.
Will you handle the old plumbing in a heritage-home bathroom?
Yes — in older downtown and Brooklin homes we expect galvanized lines near the bathroom and replace them while the wall is open.
Combining work? See kitchen renovations or a finished basement in Whitby.
