A bathroom renovation is a waterproofing job before it’s a design project — behind the tile, the membrane decides whether the room lasts. In Pickering that means two kinds of work: updating tired bathrooms in the established Bay Ridges and West Shore homes, and upgrading the builder-grade bathrooms in newer Seaton and Duffin Heights builds to something better.
Waterproofing done right
Tile doesn’t keep water out; the membrane behind it does. Every wet area we build gets a proper bonded waterproofing system over cement board — not the green drywall we still pull out of older Pickering bathrooms. Walk-in and curbless showers need the slope, drain, and membrane coordinated before the first tile. Heated floors go in at rough-in while it’s cheap, tied into the electrical permit. On the West Shore near Frenchman’s Bay and the lake, higher humidity makes proper bathroom ventilation — sized and ducted to the exterior, not the attic — especially important.
Older plumbing, newer upgrades
In 1970s–80s homes we often find plumbing worth updating while the wall is open; our plumbing crew handles it. In new builds, the work is usually a finish upgrade — better tile, a frameless glass shower, a double vanity, and heated floors — on sound bones.
What it costs in Pickering
- Powder room — $7,500 to $14,000.
- Family bath, full gut — $17,000 to $32,000.
- Primary ensuite — $28,000 to $55,000-plus depending on stone, glass, and layout.
The full breakdown is on our bathroom renovation page.
Frequently asked questions
Can you upgrade my new-build ensuite?
Yes — builder ensuites are sound but basic. We upgrade the shower, tile, vanity, and add heated floors for a spa-grade result on a quick timeline.
Do I need a permit?
Like-for-like fixture swaps generally don’t; moving plumbing or walls or adding circuits does. We pull it when the scope requires and handle inspections.
Combining work? See kitchen renovations or a finished basement in Pickering.
