Kitchen Renovation in Pickering

Pickering kitchens fall into two camps, and the right approach depends on which one you’re in. There are the established 1970s and ’80s homes in Bay Ridges, Amberlea, and the West Shore, where the kitchen is closed off and dated; and there are the brand-new Seaton and Duffin Heights builds, where the layout is fine but the builder-grade kitchen leaves a lot on the table. We renovate both.

Opening up the older Pickering kitchen

In the 1970s–80s subdivisions, the kitchen was built as a separate room, and the most-requested change is opening it to the dining and family space. That wall is often load-bearing, so it means an engineered beam, sized by an engineer and permitted (see framing). Homes of that vintage may also have aluminum branch wiring and a panel that’s full, so an electrical upgrade often rides along with the kitchen.

Upgrading a builder-grade new-build kitchen

In Seaton and Duffin Heights, the structure is sound and the work is about lifting a basic builder kitchen to something custom — better cabinetry, stone counters, a proper island, an upgraded range and hood, and storage that actually works. Because the bones are good, these projects move quickly and focus on finishes and function.

Budget and process

A full kitchen renovation in Pickering typically runs $35,000 to $80,000-plus depending on cabinetry grade, whether walls move, and the appliance package. We give a fixed-price contract once the design is locked. The deeper breakdown is on our kitchen renovation page.

Frequently asked questions

My Seaton home’s kitchen is new but basic — is it worth renovating already?
Often yes. Builder kitchens are sound but minimal; upgrading the cabinetry, counters, island, and storage gives you the kitchen you actually wanted, and because the structure and services are new, it’s efficient work.

Can you open up my Bay Ridges or West Shore kitchen?
Usually — the wall is typically load-bearing, so it means an engineered beam and a permit. We confirm with an on-site assessment and an engineer’s beam spec before quoting.

How long does it take?
A finish-focused new-build upgrade runs three to five weeks; a full gut with a structural opening and panel upgrade, six to ten.

Doing more? See home renovations in Pickering or add a bathroom renovation while the trades are on site.

Get a Free Quote

Amar Royal Renovations